Pre-feasibility study for the proposed Emmerson Hydropower Development Project
Title
Pre-feasibility study for the proposed Emmerson Hydropower Development Project
Author
Yeaman, Sam
Host Organization
Emmerson Lumber
Host contact: Emmerson, Kim
Host contact: Emmerson, Kim
Supervising Faculty
Carl, Leon
Department: Environmental and Resource Science/Studies
Department: Environmental and Resource Science/Studies
Reference Number
TP-399
Date
2003
Location of Document
U-Links Office and online
Area
Haliburton County
Subject
Proposed micro-hydro development
Abstract
Micro-hydro is an attractive means to reduce many of the problems associated with larger hydropower operations, since the scale of the operation is much smaller and river flow is typically unregulated.
Emmerson Lumber is considering development of electricity generation at an existing dam on the Drag River in Haliburton. This report performs a cursory examination of two of the biggest issues surrounding the proposed development project: engineering/costs and the possible environmental impacts. It lays the groundwork for a pre-feasibility study, and for further assessments beyond this level.
Topics covered are a description of the planned site, engineering and design, environmental assessment, modification, mitigation, and compensation. General recommendations conclude the report.
Emmerson Lumber is considering development of electricity generation at an existing dam on the Drag River in Haliburton. This report performs a cursory examination of two of the biggest issues surrounding the proposed development project: engineering/costs and the possible environmental impacts. It lays the groundwork for a pre-feasibility study, and for further assessments beyond this level.
Topics covered are a description of the planned site, engineering and design, environmental assessment, modification, mitigation, and compensation. General recommendations conclude the report.
Publisher
Trent University
Files
Collection
Reference
Yeaman, Sam, Pre-feasibility study for the proposed Emmerson Hydropower Development Project, Trent University, 2003